大型设备吊装注意事项
1、带电的电焊线和电线要远离钢丝绳,带电线路距离应保持在2米以上,或设有保护架,电焊线与钢丝绳交叉时应隔开,严禁接触。
1. The live welding wire and wire shall be far away from the steel wire rope, and the distance of the live wire shall be kept over 2m, or there shall be a protective frame. When the welding wire and the steel wire rope cross, they shall be separated and no contact is allowed.
2、缆风绳跨过公路时,距离路面高度不得低于5米,以免阻碍车辆通行。
2. When the cable wind rope crosses the road, the distance from the road surface shall not be less than 5m, so as not to hinder the traffic.
3、在吊装施工前,应与当地气象部门联系了解天气情况,一般不得在雨雪天、露天或夜间工作,如必须进行时,须有防滑、充分照明措施,同时经领导批准,
3. Before the hoisting construction, contact with the local meteorological department to understand the weather conditions. Generally, it is not allowed to work in rainy and snowy days, open air or at night. If it is necessary to carry out, anti-skid and adequate lighting measures shall be taken, and the measures shall be approved by the leader,
4、严禁在风力大于六级时吊装,大型设备不得在风力大于五级时吊装。
4. It is forbidden to lift when the wind force is greater than level 6, and large equipment shall not be lifted when the wind force is greater than level 5.
5、在施工过程中如需利用构筑物系结索具时,必须经过验算,能够安全承受且经批准后才能使用。同时要加垫保护层,以保证构筑物和索具不致磨损,但对下列构筑物不得使用:
5. In the process of construction, if it is necessary to use the structure tie rigging, it must be checked and calculated, and it can be used only after it is safe to bear and approved. At the same time, the protective layer shall be padded to ensure that the structure and rigging will not wear, but the following structures shall not be used:
(1)输电塔及电线杆;
(1) Transmission towers and poles;
(2)生产运行中的设备及管道支架;
(2) Equipment and pipeline support in production and operation;
(3)树林;
(3) Woods;
(4)不符合使用要求或吨位不明的地锚。
(4) Ground anchors that do not meet the use requirements or of unknown tonnage.